Open up the house without cutting corners
Removing a load-bearing wall isn't simply a matter of making a large hole and hoping the ceiling remains cheerful. We carry out structural wall removal in Portsmouth to connect extensions, enlarge kitchens and reshape ground-floor layouts. The work can include temporary support, forming suitable bearing points, and installing the steel arrangement shown in the structural design. We also handle substantial rear openings where the original house must connect with a new extension, not only small openings between existing rooms.


Control the sequence from support to finish
Structural calculations guide the steel size, position, and supporting details, while building control requirements shape the inspection stages. We plan temporary support and removal in a controlled order, then coordinate brickwork, plastering and other follow-on trades. Dust protection and weather protection are especially important where the rear of the property is opened up. Our experience also supports other builders who need difficult steel installation completed as part of a wider project.
Frequently asked questions
Do we need structural calculations before wall removal?
Load-bearing alterations normally need a structural design that specifies the required support. We use that information to plan the bearings, temporary support, and steel installation, alongside relevant building control stages.
Can you remove most of a rear wall for an extension?
Yes, we have experience opening substantial rear sections of houses and installing supporting steel. The exact method depends on the structural design, existing construction, and access available for handling the steel.
How do you manage dust and bad weather during work?
We plan protection around the opening and occupied parts of the property. Where exterior walls are affected, the sequence also considers temporary weather protection before permanent construction makes the area secure.